Product Lead Times - March 2026

We post our actual production times—no spin, no hiding—because your business deserves the truth. The 7-day and 30-day snapshots show recent swings, but the 6-month average tells the real story. While others share best-case scenarios, we share the full picture. This is a cornerstone of TWO’s commitment to transparency.

TWO USA’s US manufacturing hub is based just outside of Austin, Texas and is dedicated to producing our Colourvue, Shadesol and Highprofile Avenir ranges. Our Highprofile and Weatherwell shutters are crafted in our exclusive factory in China, known for its quality craftsmanship.

For more details on our posted lead times, please scroll to the bottom of this page.

Last Updated March 2nd, 2025

*** The below rolling averages are based on calendar days, not business days–they include weekends and holidays***

 

These numbers are based on how long orders take from submission to completion and only include orders that have finished production.

Product (Domestic)

Rolling Avg. Past 7 Days

Rolling Avg. Past 30 Days

Rolling Average Past 6 Months

Notes

Colourvue Basics

0.75 Weeks

1.5 Weeks

1.5 Weeks

-

Colourvue Essentials

4 Weeks

4 Weeks

3.75 Weeks

-

Colourvue Complete

4 Weeks

4.75 Weeks

4.25 Weeks

Add 2 weeks for cornices. Custom fabric lead times confirmed at time of ordering.

Colourvue Promotions

4.5 Weeks

3.25 Weeks

4 Weeks

-

Colourvue Drapery

9 Weeks

9.25 Weeks

8.25 Weeks

-

Colourvue Temp Shades

4 Days

4 Days

4 Days

-

Shadesol Essentials

6 Weeks

5 Weeks

6 Weeks

-

Shadesol Complete

7.25 Weeks

6.5 Weeks

7 Weeks

Add 1 week for fixed screens. Add 2 weeks Extreme orders. Custom fabric lead times confirmed at time of ordering.

Domestic Product Claims

1 Weeks

1.25 Weeks

2 Week

-

Product (International)

Projected Avg. Lead Time

Notes

Highprofile Essentials

10-12 Weeks

-

Highprofile Painted

10-12 Weeks

Add 2 weeks for special shapes and custom colors

Highprofile Poly

10-12 Weeks

Add 2 weeks for special shapes

Highprofile Stained

10-12 Weeks

Add 2 weeks for special shapes

Weatherwell Elite

10-12 Weeks

Add 4-6 weeks for RAL custom colors. Add 8 weeks for Textued Walnut.

Weatherwell Standard

10-12 Weeks

Add 2 weeks for custom colors.

Product Lead Times – Additional Notes

 

  • For the manufacturing of domestic products, the lead times are for production only and do not include delivery time and OOS items.
  • For international shutter manufacturing, lead time includes production and international shipping. Delivery with Made2Freight or domestic shipping is not included.
  • Before placing an order please check the Out of Stock page.
  • If sending shutter custom color samples or templates to head office, please add two weeks to the lead time.
  • When estimating order lead times, please be mindful of adjusting for public holidays, order query response times or drawing approvals.
  • For Made2Fit services please add 5 weeks to the noted lead time – this includes scheduling for both check measure and installation.
  • Lead times are subject to change and are based on historical data and may fluctuate based on a number of factors. While we endeavor to honor these lead times, they are not guaranteed and TWO is not liable.